Login / Register
Vulcathene Anti Siphon Unit
Useful Information
What is a Vulcathene Anti-Siphon Unit used for?
Designed to enhance laboratory drainage systems, the Vulcathene Anti Siphon Unit prevents foul air release while admitting air to counteract induced or self-siphonage, protecting water seals in traps. Suitable for 51mm pipes, it includes a rubber seal for secure insertion, ensuring optimal functionality and compliance with BS EN12380 (A11).
Key Features
- Siphonage Protection: Prevents water seal loss in traps by admitting air during siphonage.
- Foul Air Prevention: Blocks the escape of unpleasant odours from the drainage system.
- Easy Installation: Comes with a rubber seal for straightforward setup with 51mm Vulcathene pipes.
- Compliance: Approved to BS EN12380 (A11), meeting high standards of quality and safety.
Specifications
- Product Codes: V467020
- Available Sizes: 51mm
- Approvals: BBA 24/7091
- Material: Black Co-Polymer PP (a unique composite engineered for chemical resistance and UV protection).
- Temperature Range: Suitable for temperatures from -20°C to +100°C.
- Applications: Laboratory drainage.
Product Code | Manufacturer Code | Size (mm) | A (mm) | B (mm) | C (mm) |
376858 | V467020 | 51 | 61 | 22 | 36 |
How to Install Vulcathene Mechanical Fittings
Creating a secure mechanical joint with Vulcathene fittings involves a precise and methodical process to ensure optimal joint integrity and system performance. Follow these steps for installation:
- Cutting the Pipe:
- Use a rotary plastic pipe cutter for a clean, burr-free cut. Clamp the pipe to avoid distortion.
- Ensure the cut is square. If a hacksaw is used, remove all burrs and loose material.
- Groove the pipe using the appropriate grooving tool for the tongued olive to fit in.
- Grooving:
- Insert the pipe fully into the grooving tool.
- Adjust the blade depth to about half and rotate the tool anti-clockwise around the pipe.
- Increase the blade to full depth, continue rotating, then remove the tool and clear any swarf.
- Assembling the Joint:
- Slide the nut onto the pipe, with the threaded side facing the groove.
- Insert the olive (widest end first) into the groove. Use Vulcathene lubricant for ease, especially with larger sizes.
- Ensure the olive is correctly seated and the fitting thread is clean. Apply lubricant to the fitting threads.
- Loosely assemble the joint and hand-tighten the nut using two Vulcathene spanners, then tighten fully to ensure a secure fit.
Note:
- Tighten nuts progressively during installation, not all at once at the end.
- Use the Vulcathene grooving tool and spanners to guarantee the joint's integrity.
For detailed instructions, it's crucial to refer to the Vulcathene Installation Guide.